Powered by MOMENTUM MEDIA
defence connect logo

Powered by MOMENTUMMEDIA

Powered by MOMENTUMMEDIA

NT government, CDIC calling for Darwin harbour ship lift EOI

NT government, CDIC calling for Darwin harbour ship lift EOI

The Northern Territory government is seeking Expressions of Interest (EOI) from suitably qualified contractors to oversee and manage the design and construction of the Darwin Ship Lift and Marine Industry Project in order to support the growing defence presence in Northern Australia. 

The Northern Territory government is seeking Expressions of Interest (EOI) from suitably qualified contractors to oversee and manage the design and construction of the Darwin Ship Lift and Marine Industry Project in order to support the growing defence presence in Northern Australia. 

The NT government is building the largest ship lift in Northern Australia. The Darwin Ship Lift Facility will enable the maintenance and servicing of Defence and Australian Border Force vessels, along with commercial and private vessels, including from the oil, gas and marine industries.

The ship lift facility will be designed to meet the needs of the general maritime sector and the current and long-term needs of the Department of Defence and the Australian Border Force, while supporting local jobs and economic growth in the Territory.

==============
==============

Once operational, the facility will be a catalyst for the development of a marine maintenance and servicing industry and the creation of many new jobs.

The common user ship lift facility will include:

  • a ship lift 26m wide, 103m long and 6m deep
  • lifting capability of 5,000 tonnes
  • wet berths (wharves)
  • additional hardstand area for ship repair and maintenance works.

The ship lift will have the capacity to lift vessels such as the new fleet of offshore patrol vessels procured by the Australian Defence Force.

The ship lift facility will be a common user facility, which will enable vessel owners to choose and manage their own service and maintenance providers. This will also enable multiple providers to operate concurrently at the facility.

An agreement between the NT government and Paspaley will result in the facility being constructed on NT government-owned land.

The ship lift is a common user facility that will operate on a commercial basis. There will be a legislated open access regime to ensure fair and equal use for all customers. Pricing and access will be overseen by the independent Utilities Commission. Construction is anticipated to take two years, enabling the facility to be operating in 2024.

A briefing to discuss the project scope, procurement staging and packaging options will be held on 1 September 2020 from 8:30am to 10am.

Web conferencing facilities will be available and there will be a live stream option via Zoom.

The briefing is limited to the project scope, procurement staging and packaging options. There will be no additional technical or design information provided at the briefing – this information will be released in Stage 2 – Request for Proposals.

Stephen Kuper

Stephen Kuper

Steve has an extensive career across government, defence industry and advocacy, having previously worked for cabinet ministers at both Federal and State levels.