RAAF becomes first US ally to field AIM-260 missile in major air combat capability boost
Australia will become the first nation outside the United States to operate the AIM-260 Joint Advanced Tactical Missile, with a $7...
Defence scientist recognised for driving Australia’s sovereign missile propulsion breakthrough
The architect behind Australia’s emerging sovereign rocket propulsion capability has received Defence’s highest individual sci...
Australian Adaptability: Ukraine’s drone war is changing warfare, can the ADF adapt fast enough to keep up?
Will the rapid evolution of uncrewed systems on the battlefields of Ukraine force the Australian Defence Force to rethink how it d...
Australian-built rocket motor passes first flight test in guided weapons milestone
Australia has successfully flight-tested a domestically designed and manufactured advanced solid rocket motor for the first time, ...

General Dynamics lays keel for first Colombia Class SSN

Naval
|
By: Reporter
General Dynamics lays keel for first Colombia Class SSN

The US Navy is one step closer to securing the first of six Columbia Class ballistic missile submarines.  

The US Navy is one step closer to securing the first of six Columbia Class ballistic missile submarines.  

General Dynamics Electric Boat has laid the keel for the future USS District of Columbia (SSBN 826) during a ceremony in Quonset Point, Rhode Island.

The lead ship, recently named in honour of the US capital, is scheduled to enter service with the US Navy in 2027.

 
 

The ceremony for the future USS District of Columbia comes just weeks after General Dynamics secured a modification to a previously awarded Columbia Integrated Product and Process contract from the Naval Sea Systems Command.

The contract modification, valued at approximately US$314 million (AU$446 million), is expected to support the development and expansion of a submarine industrial base and the subsequent production of Columbia Class ballistic missile submarines.

The deal is also tipped to provide additional support for the manufacturing, procurement and delivery efforts for United Kingdom Strategic Weapon Support System kits.

This builds on the US$9.5 billion contract to construct and test the lead and second ships of the Columbia Class ballistic missile submarines SSBN 826 and SSBN 827.

Full construction of the SSBN 827, the future USS Wisconsin, is scheduled to commence in fiscal year 2024 upon Congressional authorisation and appropriation. 

The company has been tasked with performing about 78 per cent of the construction of the Columbia Class.

The Columbia Class submarine is billed as a 560-feet (170 metres) long vessel with a load capacity of nearly 21,000 tonnes – the largest ever built by the United States.

The submarine is expected to have a life-of the-ship fuel core, capable of powering the submarine for its entire service life.

[Related: US Navy commissions new LCS]

Want to see more stories from trusted news sources?
Make Defence Connect a preferred news source on Google.
Click here to add Defence Connect as a preferred news source.

Tags: